KEBS Recent Projects
Commercial Development Projects
Trilogy Health Services, Assisted Living
East Lansing, MI
Services provided:
Engineering site design - water, sewer, storm sewer, permeable pavement
ALTA, boundary and topographic surveys
Construction staking
Vision Collision, Automotive Repair
Holt, MI & Various Michigan Locations
Services provided:
Engineering Site Design
Topographic and boundary surveys
Construction staking

Retail Shopping Mall, Okemos, MI
(including Chili’s and Olive Garden stand-alone restaurants)
Services provided:
Engineering Site Design – water, sewer, and storm sewer
Topographic survey
KEBS provided redesign of the parking facilities, utilities, storm sewer, and green space for a 125,000 sq. ft. multi-building addition to the existing mall. Designs incorporated a future out-lot expansion and preparation for a stand-alone restaurant site centered in a reconstructed parking area.
Culvers Restaurant
W. Saginaw Hwy., Lansing, MI
Services provided:
Engineering
Boundary
Topographic & Mortgage surveys
Construction staking
Government Projects
Northeast Ingham Emergency Services Authority (NEISA) Fire Station
Williamston, MI
Services provided:
Site Engineering
Topographic Survey
Construction Staking
Portland/Lowell State Game Area Trail
Michigan Department of Natural Resources
Portland, MI
Services provided:
Site Engineering
Topographic survey
Sleepy Hollow State Park
Boat Launch and Parking Lot
Laingsburg, MI
Michigan Department of Natural Resources
Services provided:
Engineering
KEBS provided design and construction management for a new state park boat launch ramp access and parking lot reconstruction. The project included design of a new access road with direct access to the boat launch and elimination of more than two miles of an old deteriorated roadway. The expanded parking lot was designed to utilize asphalt millings reclaimed from the old access roadway as base material and incorporated pervious concrete allowing for stormwater pretreatment prior to being discharged to existing wetlands.
Michigan State University
Farm Lane Expansion and Lowering
East Lansing, MI
Services Provided:
Surveying
Construction Staking
KEBS provided surveying and construction staking for this project that involved moving Farm Lane to the west to avoid environmental impacts on Baker Woodlot and lowering the road under two existing railroad crossings. The road was widened from two lanes to five and new sidewalks and bike paths were added. New pump stations and detention basins were also part of the project as well as extensive landscaping and two new service drives constructed just west of Farm Lane.
Private Projects
Hope Landing – Assisted Living
Charlotte, MI
Services provided:
Engineering
ALTA and topographic surveys
Construction staking
KEBS provided design and construction engineering for a new 20-unit assisted living facility that included planning for Phase 2 expansion, relocation of a county drain and regional stormwater master planning.
Hayes Green Beach Memorial Hospital
Charlotte, MI
Services provided:
Engineering
ALTA and topographic surveys
Construction staking
KEBS survey department completed ALTA and topographic surveys and construction staking for the expansion of Charlotte’s Hayes Green Beach Memorial Hospital. Engineering services included design of a second public access road which was incorporated into the layout of the hospital’s expanded parking area.
Residential Projects
The Lodges of East Lansing Apartments
Phases 1 & 2
East Lansing, MI
Services provided:
Engineering site design for water, sewer, storm sewer, permeable pavement
ALTA, boundary and topographic surveys
Construction staking
Hawk Hollow Condominiums, Houses & Chapel
Bath, MI
Services provided:
Engineering site design for water, sewer and storm sewer
Condominium documents
Condominium and house stake outs
Construction staking & Wetland permits
Eagle Eye Condominiums
Bath, MI
Services provided:
Engineering site design for water, sewer and storm sewer
Topographical survey
Condominium documents
House stake outs
Construction staking
Cottages at Chandler Crossing
East Lansing, MI
Services provided:
Engineering site design for water, sewer and storm sewer
Surveying
Construction staking
The Beaumont Mixed-Use Development
East Lansing, MI
Services provided:
Engineering site design for water, sewer and storm sewer
Boundary and Topographical survey
Construction staking
Parkside at College Fields
Residential Development
Okemos, MI
Services provided:
Engineering site design for water, sewer and storm sewer
Topographic survey
Condominium documents
Construction staking
Okemos Preserve, Subdivision
Okemos, MI
Services provided:
Engineering site design for water, sewer and storm sewer
Topographic survey
Mallard Pond
Multi-Family and Site Condominium Development
Howell, MI
Services provided:
Engineering site design for water, sewer and storm sewer
Boundary survey
Construction staking
Shadow Glenn Condominiums & Houses
Multiple Phases
Grand Ledge, MI
Services provided:
Engineering site design for water, sewer and storm sewer
House stake outs, Construction staking
Boundary and topographic surveys
KEBS provided Master Plan layout and design of a multi-phased 119-lot platted subdivision and a 76-unit residential condominium on approximately 100 acres. The project involved a county drain relocation and permitting for stormwater storage and discharge to forested wetlands. Surveying services included boundary and topographic surveys, construction staking, house stakeouts, and conversion of the condominium area from duplex units to single-family residential.
Georgetown of Okemos
Subdivision, Meridian Township, MI
Services provided:
Engineering site design for water, sewer and storm sewer
Subdivision plan
House stake outs
Construction staking